PHONE +61 (03) 8752 2379

CONTACT:  MagEfekt

ADDRESS: Factory 28 / 73 Assembly Drive, Dandenong South 3175

  • Facebook Social Icon

© 2017 MagEfekt

website design: wilcoxdesign.com.au

July 3, 2018

As part of the Victorian Government's strategy to highlight innovative companies, Magefekt was invited to tell it's story. Max Coulthard, Magefekt's Managing Director tells the story of the Tardis Battery, a small compact Lithium Iron Phosphate Battery that was designe...

October 23, 2017

Magefekt now has three phase power residential and commercial systems.  Working with REA Ltd we recently had two residential systems and a commercial system installed all running on Tardis 24 Volt batteries.  Because Tardis batteries are simply plug and play we are abl...

October 23, 2017

The Tardis Battery has gone to the land of the Yack, thats Yackandandah in Northern Victoria.We recently commissioned North East Water's new off-grid water treatment plant. 24 Tardis Batteries now drive the entire town's water supply. With the help of Renewable Energy...

October 23, 2017

Magefekt in collaboration with Renewable Energy Alliance (REA) has updated its Avantess residential single phase range to include a 5-kW inverter and can now be floor mounted on a plinth. As always, these systems can be made from marine grade Aluminum or Zinc plated st...

July 18, 2017

Background Case Notes: 

Magefekt started battery production five years ago.  It did so to provide batteries for a local wheelchair manufacturer that wanted to keep its most vulnerable customers safe yet provide them more power to go further and for longer.  Since this t...

April 13, 2017

Photo (left to right) Jesse Cottrell, GreenSync, Ben Bowen, GreenSync, Daniel Yung, EcoPower, Max Coulthard Magefekt, Kelsey Rowe, GreenSync

Representatives of GreenSync (specialists in integrating power grids, distributed generation and storage) recently visited the Ma...

March 17, 2017

Magefekt and South East Water (SEW) launched the Solar Powered Pressure Pod System

March 17, 2017

Exceptional energy and cost savings now available with advance battery technology!Andrew Lamb from Magefekt presented on battery technology

January 20, 2016

SunEdison visits MagEfekt on 20 January 2016 to look at our new Hybrid Home Energy System. The system incorporates a 48V, 210Ah Tardis battery bank, and Victron MultiPlus inverter, MPPT BlueSolar charge controller and battery monitor. The hybrid system is powered by a...

Please reload

Featured Posts

South East Water's system at Trumans Road Reserve installed by us, including our Tardis Battery.

March 17, 2017

1/1
Please reload

Recent Posts

October 23, 2017

April 13, 2017